The house was built in 1979. A complete renovation of all engineering systems was carried out, including heating risers. The complex composition of the broom tiles required maximum attention from the master.
Similar projects
The house was built in 1979. A complete renovation of all engineering systems was carried out, including heating risers. The complex composition of the broom tiles required maximum attention from the master.